Preparation before instalation

Important points that must be paid attention in the installation area:

- There could be some accidents risks when installation will be done on the roof or terrace.Therefore, required precautions should be taken against the accidents.
- Determine the area installation area.
- it should be obeyed to the construction conditions, technical conditions and regional directions during installation.
- If the collector will be installed on the roof, the collector must be mounted on south side and should be directed to the south. If it is possible the collector should be installed on the south side of the chimney. While, fume that becomes from chimney can make dirty the glass of the collector. 
-Trees, high buildings chimneys… etc. should not make shadow to the collector surface.
- The collector must be installed fasten against to strong windy conditions.
- The appropriate place should be chosen for installation. The chosen place must not create a bad view for the buildings.
-  The authorized installers should install the collectors.

Installation
Starting to installation according to the below written order. Check the nut and bolt connections.
After the installation of the chase profiles, fix the branch to the ground or roof slices. The montage angle could be chosen between 25° and 45°.
 
The below operations should be followed during the installation of the packaged systems.
 
Authorized installers must do the installation.  
 
- To deliver the collectors, tank chase profiles and all of the other safety equipments to the working area.  
-  To deliver the collectors and the parts to the installation area.  
-  To prepare on the roof the parts regarding the chase.
- To install the chase profile.
- To install the solar tank in to the chase profile. 
- To isolate the holes that opened on the roof.
- To install the collectors in to the chase profile.
- To make the installation between the collectors and the solar tank and to install the safety equipments
- To make the isolation of the system.
- To do the electrical installation to the required places. 
- To make the pressure test of the system.
- To prepare the water with antifreeze and to send in to the circuit and to inhale the system air.
- To operate the system.

PREPARATION BEFORE INSTALLATION.pdf

Sellectiva sun solar systems
Technical data
Accesories
Before installation...
Call line: < +48 605 580 126>

Cht-cichewicz heating technique © 2001-2007 All rights reserved

Created by: www.zaler.eu
Ihs heizkessel pellets
Kotły na pelety
klimatyzacja
dywany warszawa
data mining, analiza danych
giant rowery górskie
History
Awards
Press Room
Export partners
Biomass boilers with automatic feeding
Wood fired boilers with manual loading
Coal boilers Futura econo
SPECTRA Stove with water jacket
Sellectiva sun solar systems
Technical data
Accesories
Before installation...
Boiler connection
Stove connection
Vacuum system of Pellets feeder
Pellets silos